Power installations and small works
More sockets, new circuits and tidy power upgrades, from one extra double socket to three-phase supplies for business.
When you need it
- You never have enough sockets and rely on extension leads
- You need a socket or USB charging point in a new place, such as a kitchen island or wall-mounted TV
- A new cooker, hob, electric shower or heavy appliance needs its own supply
- A garden office, shed, garage or workshop needs power
- You are extending or refitting a kitchen, loft or room
- Your business needs power for new machinery, kitchen equipment or workstations
- Equipment needs three-phase power, or an existing three-phase supply needs new circuits
- Cables, trunking and sockets in a shop or office look untidy and need sorting
What is included
- Extra sockets and switches added to existing circuits, including USB sockets
- Fused spurs and supplies for fixed appliances, such as extractors and heaters
- New dedicated circuits for cookers, hobs, showers and outbuildings
- Outdoor sockets with the right weather rating and RCD protection
- Three-phase distribution boards, circuits and supplies to machinery and equipment
- Neat trunking, conduit and dado systems for shops, offices and workshops
- Moving or removing old sockets and circuits that are no longer needed
- Testing when the work is finished
What to expect on the day
We first check that your existing installation can safely take the extra load. Adding sockets to a circuit that is already stretched, or to old wiring, can cause problems later, so we tell you if anything needs attention first.
We agree where cables will run, keep chasing and mess to a minimum, and agree any making good beforehand.
If a business needs a new or upgraded three-phase supply, we explain what is involved and install the boards and circuits that run from it.
Questions people ask
Can you add a socket without running a new circuit?
Often, yes. A new socket can usually be added to an existing circuit, as long as the circuit is in good condition and can take the extra load. We check this first.
What is three-phase power and do I need it?
Three-phase power delivers more power more evenly than a normal single-phase supply. It is used for larger machinery, commercial kitchens, lifts and some EV chargers and heat pumps. If your equipment needs it, the specification will say so.
Can you tidy up the wiring in my shop or office?
Yes. We can replace trailing leads and messy cables with fixed sockets, trunking or floor boxes, so the space looks better and is safer to work in.
Not yet reviewed by a qualified electrician.
Ask about power installations and small works
Tell us what is happening and we will get back to you.
Not set yet: phone number, WhatsApp number, response time, area covered. Add them in src/config/site.ts. Until then the quote form is the only contact route shown.